About
Two orthogonal, twisted loops of different sizes give a circularly polarised antenna with a wide, nearly hemispherical beam, ideal for weather and amateur satellites. Set the frequency, wire and twist and read the dimensions to cut.
Steps
0 of 5 done
How it works
Construction and drilling tips
Feedpoint and loop connections
At the top feedpoint, cross-wire the loops: terminal B of loop 1 connects to terminal C of loop 2, and terminal D of loop 1 connects to terminal A of loop 2. Connect the inner conductor of your coax cable to one pair and the shield to the other. Hide the mast in the 3D model to see this connection route clearly inside it.
Coaxial choke balun
Immediately below the bottom of the loops, wind your RG-58 coaxial feedline tightly around the PVC mast for 5 turns (the RF choke balun shown in the 3D model). It acts as a balun and stops common-mode currents on the coax shield.
Bending corners
When building QFH loops from rigid copper pipe, use a pipe bender that matches your bend radius of 6 mm. The 3D model draws these transition arcs accurately, which reduces mismatch compared with sharp corners.
Quiz
Drilling template
Print at 100% (actual size) and check that the red ruler measures 50 mm before you drill. Holes A to D are marked on three strips that wrap around the mast.
Wire forming template (unrolled)
RHCP (right hand / counter-clockwise)Straighten the wire before bending. Mark all drilling and bending points with a pen or tape.
Mast IN/OUT is where the wire passes through the vertical support tube. T1/T2 are the feedpoint terminals. Helical twist direction, looking from the top: counter-clockwise (180° total rotation). Scroll horizontally to see the whole ruler.
| Position (mm) | Description | Distance from previous |
|---|---|---|
| 0.0 | T1: feedpoint terminal 1 (inside the mast) | — |
| 17.4 | ★ Mast OUT: exit from the vertical support tube (top of branch B1) | +17.4 |
| 44.1 | Straight arm ends / corner bend starts (top of branch B1) | +26.8 |
| 53.8 | Helical twist starts (branch B1, downwards) | +9.6 |
| 316.6 | Helical twist ends (branch B1, downwards) | +262.9 |
| 326.3 | Corner bend ends / straight arm starts (bottom of branch B1) | +9.6 |
| 353.0 | ★ Mast IN: entry into the vertical support tube (bottom of branch B1) | +26.8 |
| 370.4 | ↕ Vertical support tube center at the bottom | +17.4 |
| 370.4 | ◆ Wire midpoint: central point of the wire | +0.0 |
| 387.8 | ★ Mast OUT: exit from the vertical support tube (bottom of branch B2) | +17.4 |
| 414.5 | Straight arm ends / corner bend starts (bottom of branch B2) | +26.8 |
| 424.2 | Helical twist starts (branch B2, upwards) | +9.6 |
| 687.0 | Helical twist ends (branch B2, upwards) | +262.9 |
| 696.7 | Corner bend ends / straight arm starts (top of branch B2) | +9.6 |
| 723.5 | ★ Mast IN: entry into the vertical support tube (top of branch B2) | +26.8 |
| 740.8 | T2: feedpoint terminal 2 (inside the mast) | +17.4 |
| Position (mm) | Description | Distance from previous |
|---|---|---|
| 0.0 | T1: feedpoint terminal 1 (inside the mast) | — |
| 17.4 | ★ Mast OUT: exit from the vertical support tube (top of branch B1) | +17.4 |
| 41.7 | Straight arm ends / corner bend starts (top of branch B1) | +24.3 |
| 51.4 | Helical twist starts (branch B1, downwards) | +9.6 |
| 300.9 | Helical twist ends (branch B1, downwards) | +249.5 |
| 310.5 | Corner bend ends / straight arm starts (bottom of branch B1) | +9.6 |
| 334.9 | ★ Mast IN: entry into the vertical support tube (bottom of branch B1) | +24.3 |
| 352.3 | ↕ Vertical support tube center at the bottom | +17.4 |
| 352.3 | ◆ Wire midpoint: central point of the wire | +0.0 |
| 369.6 | ★ Mast OUT: exit from the vertical support tube (bottom of branch B2) | +17.4 |
| 394.0 | Straight arm ends / corner bend starts (bottom of branch B2) | +24.3 |
| 403.6 | Helical twist starts (branch B2, upwards) | +9.6 |
| 653.1 | Helical twist ends (branch B2, upwards) | +249.5 |
| 662.8 | Corner bend ends / straight arm starts (top of branch B2) | +9.6 |
| 687.1 | ★ Mast IN: entry into the vertical support tube (top of branch B2) | +24.3 |
| 704.5 | T2: feedpoint terminal 2 (inside the mast) | +17.4 |
| Item / component | Specification and notes | Quantity | Dimensions / length |
|---|---|---|---|
| Large helical loop (loop 1) | Soft copper tube/wire Ø 4 mm (Bare aluminium wire or tube) | 1 loop | 740.8 mm |
| Small helical loop (loop 2) | Soft copper tube/wire Ø 4 mm (Bare aluminium wire or tube) | 1 loop | 704.5 mm |
| Total copper conductor length | Total for both loops (includes +150 mm bending allowance) | 1 roll | 1.6 meters |
| Horizontal support crossbars | Fiberglass/acrylic rod or copper tube Ø 6 mm | 4 pcs | Dc1: 98 mm | Dc2: 94 mm |
| Central support mast | Rigid PVC pipe Ø 34 mm | 1 pc | ≥ 574 mm |
| 90° copper elbows (if soldered) | Copper solder 90° elbows Ø 4 mm (skip if pipe-bent) | 8 pcs | Standard copper |
| Feedline and RF choke balun | 50 Ω RG-58 coaxial cable (coiled 5 turns around the support mast) | 1 spool | Balun: ~534 mm + feedline |
| RF connector and weatherproofing | Chassis-mount female SMA/BNC, PVC endcap, RTV silicone sealant | 1 set | 100% outdoor sealed |